USD 340 Jefferson West
FACILITIES



Facilities Needs List
Updated October 28, 2025
The following list of facility needs was developed by the Facilities Planning Committee with the focus on existing infrastructure, and what should be addressed in the next 5 – 10 years or the district would be significantly behind when keeping our facilities safe, efficient, and operational for student learning. This is not an all-inclusive list, but a beginning to a conversation about our existing facility needs. It also includes new space for student growth considerations.
All Facilities
Upgrade security systems/cameras.
Window protection film for all entrances.
Roof replacements for certain sections of buildings.
Masonry crack repairs.
Sidewalk/concrete repairs.
Downspouts and drainage
Lighting replacement
Painting throughout the district
Refinish gym floors at JWPS & MS
Preschool
Rooftop HVAC Unit for 6 original classrooms with PTAC wall units.
Window replacement in 6 original classrooms.
Secured front entrance with windows for visibility.
Foundation and wall crack repairs.
Restroom upgrades
Kitchen remodel
Outdoor playground/classroom furniture and sunshade
Elementary School
2-4 new classrooms for student growth
Rooftop HVAC Unit for 20+ classrooms with PTAC wall units.
Fire Alarm Systems
Upgrade electrical panels and surge protectors.
Middle School
2-4 new classrooms for student growth
Rooftop HVAC Unit for 10 classrooms with PTAC wall units.
Replace gym heating.
Exterior waterproofing/insulation.
Replace one transformer and upgrade electrical panels and surge protectors.
Repair classrooms with floor and wall structural issues.
Upgrade Volleyball Standards and scoreboards in gym
Back Exit foundation repair.
Diverting water from high school.
High School
Upgrade electrical panels.
Food Storage and Freezer space for consolidated kitchen.
Replace speaker & intercom system.
Locker area remodel.
Concrete walk replacement at entrance.
Concrete pillar repair at entrance.
Parking lot repairs.
Upgrade VB standards.
Locker room ventilation.
Vocational Agriculture
HVAC upgrades. (Just replaced this summer, but ventilation is still an issue)
Electrical services.
Classroom upgrades
Exterior upgrades
Football/Track/Transportation Complex
Replace/repair existing track.
Building structure to cover buses.
Other Possible Purchases
Passenger Bus – either route or activity
Activity Van
Maintenance truck – 350 or 3500
Skid Steer
Equipment: Preschool lunchroom tables, student desks/chairs, etc.



